Most concrete is sold on a handshake and a low number. Ours is built to a documented standard and carries a written workmanship warranty. Here's exactly what goes into the ground on every 865 Titan project — and what we stand behind.
The same six things go into every job — patio, driveway, or pool deck. It's the part you can't see from the curb, and the reason the finish lasts.
A compacted #57 stone base is built under every pour for stable footing and proper drainage — the foundation that keeps a slab from settling and cracking before it ever sees concrete.
Compacted #57 stoneA true 4-inch slab thickness, formed and checked across the whole pour — not thinned out at the edges to stretch a yard of concrete and shave the bid.
4″ verified thicknessWe pour a 3,500 PSI mix — above the typical 3,000 PSI residential standard — for added compressive strength and a longer service life in East Tennessee's freeze-thaw seasons.
3,500 PSI mixWire-mesh reinforcement is placed where the project calls for it — driveways, vehicle loads, and large-format slabs — to help control cracking and distribute load.
Wire-mesh reinforcementFinished with premium SRS sealer from Southern Rebar — longer-lasting protection and richer, deeper color than the off-the-shelf sealers most crews use. Anti-slip additive on pool decks and walkways.
SRS premium sealerDefined scope, base prep, slab thickness, finish, pattern, color, timeline, and an exact price — all documented in a written proposal before we ever break ground. No surprises, no day-of add-ons.
Written proposalBecause "we do good work" should mean something on paper.
Backed in writing
Walk your space with us and we'll put the whole standard — spec, finish, timeline, and an exact price — in writing, with no obligation.